Your browser is out-of-date.

In order to have a more interesting navigation, we suggest upgrading your browser, clicking in one of the following links.
All browsers are free and easy to install.

 
  • in vitruvius
    • in magazines
    • in journal
  • \/
  •  

research

magazines

projects ISSN 2595-4245


abstracts

português
O Museu de Arte de Aspen (MAA) abriu as portas do seu novo prédio projetado por Shigeru Ban no dia 9 de agosto de 2014. O novo edifício está localizado na East Hyman Avenue 637, no coração do dentro urbano de Aspen.

english
The Aspen Art Museum (AAM) opened the doors of its new, 33,000-square-foot Shigeru Ban-designed building to the public on Saturday, August 9, 2014. The new building is located at 637 East Hyman Avenue in the heart of downtown Aspen.

how to quote

PORTAL VITRUVIUS. New Aspen Art Museum. Projetos, São Paulo, year 15, n. 175.01, Vitruvius, jul. 2015 <http://165.22.0.112/revistas/read/projetos/15.175/5632>.


Located on the corner of South Spring Street and East Hyman Avenue in Aspen’s 3 downtown core, the new AAM is Shigeru Ban’s first permanent U.S. museum to be constructed. Ban’s vision for the new AAM is based on transparency and open view planes—inviting those outside to engage with the building’s interior, and providing those inside the opportunity to see their exterior surroundings.

New Aspen Art Museum, Colorado, transparency in vertical circulations. Shigeru Ban Architects
Foto David X Prutting [Foto divulgação]

The main entrance is located on the north side of the building along East Hyman Avenue, which allows access to the reception area and two ground-floor galleries. From there, visitors may choose their path through museum spaces—ascending to upper levels either via Ban’s Moving Room glass elevator in the northeast corner, or the Grand Stair on the east side. The Grand Stair (a three-level passageway between the building’s woven exterior screen and its interior structure) is intersected by a glass wall dividing it into a ten-foot-wide exterior space and a six-foot-wide interior space. The unique passage allows for the natural blending of outdoor and indoor spaces, and will also feature mobile pedestals for exhibiting art. The exterior Woven Wood Screen is made of the composite material Prodema—an amalgam of paper and resin encased within a dual-sided wood veneer.

New Aspen Art Museum, Colorado, narrow spaces. Shigeru Ban Architects
Foto David X Prutting [Foto divulgação]

From the roof-deck sculpture garden, visitors will enjoy unparalleled vistas of Aspen’s environment and the only unobstructed public rooftop view of Ajax Mountain. The roof deck will also be an activated exhibition and event space featuring the café, So, a bar, and an outdoor screening space.

Other new AAM amenities include an education space, the AAM shop/bookstore, and an on-site artist apartment, as well as art storage and preparation spaces. The AAM Shop is collaborating with New York’s iconic nonprofit art bookseller Printed Matter to feature artist-produced titles alongside its own AAM imprint publications, as well as featuring a number of unique and collectible artist-edition offerings.

The Building Project

In recent years, the AAM’s annual attendance has increased by 110%, its staff tripled, and the institution has seen the number of students served by museum educational programming skyrocket with a 1,140% increase. A longstanding strategic goal for the AAM—the expansion of its facility and relocation to the downtown Aspen core—became a necessity.

In 2007, the AAM appointed an Architect Selection Committee (which included ASC chair and then-acting Secretary of AAM’s Board of Trustees, the late Frances Dittmer; 2007 AAM Board of Trustees President Nancy Magoon and AAM Board members Larry Marx and Gayle Stoffel; and AAM National Council members Stefan T. Edlis and Diane Halle), who unanimously selected Shigeru Ban (Shigeru Ban Architects) for the project.

In August 2010, the AAM moved forward with the acquisition of property at the corner of South Spring Street and East Hyman Avenue. A groundbreaking event was held on the new site on “Aspen’s Day” 8/16/11, and construction began in October 2012, with international construction team Turner Construction in the leading role, and a goal of completion established for summer 2014.

Construction of the new AAM facility and its endowment is 100% privately funded, with overall Capital and Endowment pledges of nearly $70 million raised—$45 million in building project funds and $25 million for the museum’s endowment.

Aspen Art Museum

New Aspen Art Museum, Colorado, opening exhibition. Shigeru Ban Architects
Foto David X Prutting [Foto divulgação]

New Aspen Art Museum, Colorado, opening exhibition. Shigeru Ban Architects
Foto David X Prutting [Foto divulgação]

Founded in 1979, the Aspen Art Museum is a non-collecting institution presenting the newest and most important evolutions in international contemporary art. It is the only American Association of Museums-accredited institution in the western part of Colorado. The AAM has been instrumental in bringing the city, its citizens, and Aspen visitors the work of such acclaimed artists as Yutaka Sone, Pedro Reyes, Jeremy Deller, Aïda Ruilova, Friedrich Kunath, Mai-Thu Perret, Lisa Anne Auerbach, Jim Hodges, Peter Coffin, Fred Tomaselli, Mark Bradford, Sergej Jensen, Mamma Andersson, Stephen Shore, Huma Bhabha, Slater Bradley, Amelie von Wulffen, Mark Grotjahn, Lucio Fontana, Monika Sosnowska, Rob Pruitt, Hayley Tompkins, Lorna Simpson, Amy Sillman, Ernesto Neto, and others—many in their first major U.S. museum exhibitions or featuring important but lesser-known aspects of their artistic practice. The AAM is an admission (free institution courtesy of a 2008 gift made by AAM supporters Amy and John Phelan).

Shigeru Ban Architects America (SBA)

In 1999, Shigeru Ban formed a partnership with U.S.-based architect Dean Maltz that led to the founding of SBA Projects America. Headquartered in New York, Maltz is responsible for all North and South American-based projects. In 2006, Nina Freedman was brought on board as Project Manager for SBA Projects America. Both SBA Projects America team members have been instrumental in the management and oversight of the New AAM project.

datasheet

delivery date
august 2014 

area
2800m2

project team
Shigeru Ban Architects (SBA), Cottle Carr Yaw Architects (CCY), Turner Construction Company, Summit Construction Company and New AAM Project Manager Michael O’Connor

note

Text extracted from opening release, wrote in july 21th, 2014.

comments

175.01 equipamento público
abstracts
how to quote

languages

original: english

outros: português

source

share

175

newspaper


© 2000–2025 Vitruvius
All rights reserved

The sources are always responsible for the accuracy of the information provided